Air ducts run through rooms, floors and fire barriers. Without protection, they become a short path for fire and smoke when a fire breaks out. Fire protection of smoke extraction ducts keeps the system removing smoke while people leave the building. Fire protection of transit ventilation ducts stops the ductwork from passing fire and heat into adjacent rooms.

STATERM provides fire protection for ventilation ducts and smoke removal systems to the project design: we select a system with proven fire resistance, prepare the surface, apply the coating or install fire-protective materials, and hand over the work with as-built documentation. We work in Tashkent and travel to sites across Uzbekistan. This page covers ventilation and smoke control ducts; boiler and stove flues are a separate subject.

Why air ducts and smoke removal systems need fire protection

In a fire, the building switches to a special mode. For buildings with automatic fire alarm or fire suppression systems, ShNK 2.04.05-22 (clause 381) provides for interlocks: general ventilation shuts down, fire dampers close, smoke control systems start and smoke dampers in the fire zone open. At that moment, ducts have different jobs:

  • smoke extraction ducts keep working: the fan draws hot smoke through them from a room, corridor or hall. If the duct wall burns through or the joints open up, smoke will spread into adjacent rooms and onto escape routes;
  • pressurisation ducts supply outdoor air to stairwells, lift shafts and airlock vestibules so that smoke cannot get in;
  • transit ducts of general ventilation pass through rooms and barriers they do not serve. They must keep their integrity (criterion E) and must not heat up so much that materials beyond the barrier ignite (insulation, criterion I).

Thin steel cannot hold back fire on its own: it heats up quickly, carries heat further along the run, and gaps open at flanges and seams. Fire protection slows down heating for the time required by the design.

Fire resistance of air ducts: ShNK requirements in Uzbekistan

In Uzbekistan, fire resistance requirements for air ducts are set by national codes. The main document is ShNK (ShNQ) 2.04.05-22 (Heating, Ventilation and Air Conditioning); its official text is published in Uzbek. The code was approved by Order No. 01/2-39 of the Minister of Construction and Housing and Communal Services dated 5 August 2024 and replaced KMK 2.04.05-97*. ShNK 2.01.02-04 (Fire Safety of Buildings and Structures) requires smoke control to be provided in accordance with the ventilation codes and to start automatically (clause 5.7).

What is protectedWhat ShNK 2.04.05-22 specifiesClause
Ducts extracting smoke directly from roomsnon-combustible materials, fire resistance of at least 0.75 h (45 minutes)cl. 334
Ducts extracting smoke from corridors and hallsnon-combustible materials, 0.5 hcl. 334
Ducts removing gases after a firenon-combustible materials, 0.25 hcl. 334
Ducts supplying outdoor air during a fire (pressurisation)class P (dense), non-combustible materials, 0.5 hcl. 342
Transit ducts and collectors of general ventilationEI 15 or EI 30 depending on room categories; for some combinations no rating is set or transit is prohibitedcl. 306, Table 2
Fixings of smoke control devicesfire resistance not lower than required for the device itselfcl. 335

Transit ducts: when dampers are enough

Table 2 applies to the transit section — from the point where the duct leaves the enclosure of the room it serves or passes through a fire barrier, up to the fan room. A duct that runs only within the room it serves is not covered by it. Values are written as fractions: above the line for the floor served, below the line for outside that floor.

Fire protection has an alternative. In public, administrative and welfare buildings, and for rooms of categories V (except warehouses), G and D, transit ducts may be made of non-combustible materials with no required fire resistance, provided fire dampers are installed where they cross fire barriers rated 0.75 h or more and floor slabs rated 0.25 h or more (clause 307). In the fan room and outside the building, duct fire resistance is not regulated, except for transit ducts passing through the fan room (clause 309).

High-rise buildings and car parks

New and reconstructed residential and public buildings 50 m high and above are covered by Appendix 1 to ShNK 2.01.02-04 (Amendment No. 1, Order No. 28 of the Ministry of Construction dated 22 January 2020). Within the floor served, transit ducts of smoke control ventilation must have a fire resistance not lower than the highest rating of the fire barriers they cross; outside that floor, not lower than the rating of the floor slabs they cross (clause 8.8). For car parks, ShNK 2.05.07-24 (Car Parks) refers to ShNK 2.04.05-22 for ventilation and transit ducts (clauses 205 and 218).

Who sets the rating for each section

The rating for each section of the run is set by the designer of the heating and ventilation section of the project, based on room categories, the building’s fire resistance degree and the barriers along the duct route. We work to the design. If it does not state the ratings, we carry out fire protection design before work starts.

Duct fire protection methods: paint, mats, boards, plaster

Rectangular air duct sections with fire-protective coating before installation

Fire resistance is provided not by a material on its own but by a tested construction: a duct of a specific type and cross-section, the fire-protective layer, fixings and hangers. That is why the choice starts with the documents — whether the system is proven for ducts of this type and this rating.

MethodWhere it fitsLimitations
Thin-film intumescent paintRound and rectangular ducts in exposed locations and in tight spaces with no clearance for mats; low weight, neat appearance. When heated, the coating swells and forms an insulating char layer.Galvanised steel needs preparation and a compatible primer; the coating is vulnerable to impact; not used where it cannot be restored later.
Foil-faced basalt or mineral fibre mats and roll materialsRound and rectangular ducts, including ducts already installed; they insulate the run at the same time.Need clearance around the duct; add load on the hangers; overlaps, fixings and seam taping only as per the system details.
Board systems (calcium silicate and similar)Rectangular ducts, enclosures and shafts, sections with a high required rating; rigid, impact-resistant cladding.Heavy weight, labour-intensive installation, precise fitting at bends and transitions.
Fire-protective plasters, pastes and spray-applied compoundsLarge enclosures and shafts — if such a solution has been tested specifically on ducts.Wet process, reinforcing mesh, heavy weight; messy work on an operating site.

The coating thickness and the number of mat or board layers are set from the manufacturer’s tables and certificates for the required rating and duct type, not “by eye with a margin”. Mixing materials from different manufacturers in one system is not advisable: only the combination tested together is proven. Ordinary thermal insulation is not fire protection; it must itself meet the fire performance requirements for duct materials (ShNK 2.04.05-22, clause 322).

Fire-protective paint on galvanised steel: surface preparation

Most ducts are made of galvanised steel, which is a difficult substrate for paint. The surface is smooth; new ducts carry oil and traces of factory treatment, older ones white zinc oxidation deposits and dust. Without preparation, the coating may peel off.

  1. We inspect the run: damage to the zinc layer, rust on fixings, and places that will be out of reach once neighbouring services are installed.
  2. We degrease with a product permitted by the fire protection system documentation and remove deposits and dust.
  3. We prime only with a primer that the fire protection manufacturer approves for zinc and that is compatible with the fire-protective layer.
  4. We apply the product coat by coat, with drying between coats and under the conditions specified for the material. Thickness is checked as the work progresses.
  5. In damp rooms and outdoors, we apply a topcoat if the system requires one.

There is a location restriction. Fire-protective coatings are not used where they cannot be periodically replaced or restored (ShNK 2.01.02-04, clause 6.12). If the duct is to be enclosed in a closed shaft or behind a non-demountable ceiling, we choose another method or plan access in advance.

Flanges, hangers and wall penetrations

Fire protection works only if it is continuous. The weak points of a run are not the straight sections but everything around them.

  • Flanges, bends, tees and access doors are protected according to the detail drawings in the system documentation. This is where a layer is most often missed or a gap left.
  • Hangers, threaded rods and trapeze supports lose strength when heated, and the run can collapse together with its protection. Under ShNK 2.04.05-22 (clause 335), the fixings of smoke control devices must be no less fire-resistant than the devices themselves; ShNK 2.01.02-04 (clause 6.9) requires the same for building structures. That is why we protect fixings together with the duct.
  • Penetrations through walls and floors are sealed with non-combustible materials that maintain the fire resistance of the barrier (ShNK 2.04.05-22, clause 315). This is separate work — fire-resistant sealing of utilities.
  • Fire and smoke dampers are separate products with their own documents and are installed by the ventilation contractor. But if a damper is not set within the thickness of the barrier, the duct section from the barrier to the damper must have a fire resistance equal to that of the barrier (ShNK 2.04.05-22, clause 297).

In buildings 50 m high and above, joints of ducts with a required fire resistance are sealed with non-combustible materials, and the mating surfaces of ventilation channels and of openings with steel embedded parts are not treated with fire-protective coatings (Appendix 1 to ShNK 2.01.02-04, clause 8.9).

What EI, multi and single mean in product documents

Documents for imported systems often state European classes. This is the European test method; for a project in Uzbekistan, the rating is still set by the ShNK and the design, but the class shows exactly what was tested.

  • EN 1366-1:2014+A1:2020 — fire tests on ventilation ducts with fire from outside (duct A) and from inside (duct B). The class is assigned under EN 13501-3:2025, for example EI 60 (ve ho i↔o) S: ve and ho — vertical and horizontal installation, i↔o — fire from either side, S — an additional leakage requirement is met.
  • EN 1366-8:2024 — smoke extraction ducts passing through other fire compartments; a fully developed fire is simulated. The class under EN 13501-4:2016 is EI with the time in minutes and the suffix multi.
  • EN 1366-9:2024 — smoke extraction ducts within a single fire compartment that must operate until flashover. The class is E300 or E600 with the time in minutes and the suffix single.

The designations are given according to European Commission Decisions 2000/367/EC and 2003/629/EC. When checking documents, the key point is that the tested construction matches the project: duct type, cross-section, orientation, fire direction and rating.

How STATERM fire-protects smoke removal and ventilation systems

  1. Site visit and survey. We look at the duct runs, cross-sections and duct material, fixings, penetrations through walls and floors, working height and access. We request the ventilation section of the design.
  2. Design and specification. We list the required ratings for each section; if there are none, we prepare a fire protection design. The specification states the system for each section and the protection scheme for hangers and penetration details.
  3. Materials. For ducts, we use systems whose fire resistance is documented specifically for ducts: paints, mats or boards. If structural steel on the site also needs protection, we use STATERM’s own fire-protective paints — TERM-007 and TERM-009 (more on fireproof paints in Tashkent). The building’s fire protection is then carried out by one contractor and handed over with one set of documents.
  4. Preparation and application or installation. We work to the method statement of the chosen system, keep a work log and photograph concealed work.
  5. Inspection and handover. We check the continuity and thickness of the coating, the overlaps and fixing of mats and boards, and the protection of hangers and junctions with barriers. We hand over concealed-work inspection certificates (preparation, primer, fire-protective layer), the work log with thickness readings, the acceptance certificate and copies of material certificates and quality passports.

What determines the cost of duct fire protection

There is no single price per square metre. We prepare the estimate after an inspection or from drawings and the specification. The cost depends on:

  • surface area, cross-section shape and the share of fittings — bends, tees, transitions;
  • the required fire resistance and the chosen system;
  • height and access: scaffolding or lifts, work above a suspended ceiling or on an operating site;
  • surface condition and the amount of preparation;
  • the number of hangers, flanges and penetrations through walls and floors.

Mistakes that get duct fire protection rejected

  • The design did not state ratings for each section, the system was chosen on price, and at acceptance it turned out that its documents do not cover the required rating or that cross-section.
  • The material has documents, but they cover a test on a different construction, not a duct.
  • The section between the wall and a damper installed away from it was left unprotected.
  • The duct was protected, but the hangers, threaded rods and trapeze supports were not.
  • The paint was applied to greasy galvanised steel or over a primer the system does not allow, and it peeled off.
  • The fire protection was stopped at the wall, and the gap in the opening was filled with combustible expanding foam.
  • Installers of other services damaged the coating and it was not restored.
  • There are no concealed-work certificates, so there is nothing to prove the preparation and the number of coats.

If the coating is already damaged or has failed inspection, it is restored using a separate procedure — see the fire protection repair page.

Frequently asked questions

Do transit air ducts need fire protection?

As a rule, yes: ShNK 2.04.05-22 (clause 306, Table 2) sets EI 15 or EI 30 for them depending on room categories. For some combinations no rating is set, and in certain buildings fire dampers at barrier crossings are permitted instead of fire protection (clause 307). The design has the final say.

What fire resistance rating do smoke extraction ducts need?

Under ShNK 2.04.05-22 (clause 334): at least 0.75 h when smoke is extracted directly from rooms, 0.5 h from corridors and halls, and 0.25 h when gases are removed after a fire. Pressurisation ducts need 0.5 h (clause 342).

What paint can be used on smoke extraction ducts?

Only a fire-protective product whose fire resistance is proven for ducts of the required type and rating; ordinary paints and enamels do not provide it. The coating thickness is set from the manufacturer’s documents. If the coating cannot be renewed or a high rating is needed, mats or boards are a better choice.

Can fire-protective paint be applied to galvanised ducts?

Yes, if the system allows a zinc substrate. The surface is degreased, white deposits and dust are removed, the primer specified in the manufacturer’s documentation is applied, and adhesion is checked on a trial area.

What documents are needed to accept duct fire protection?

The usual checks cover the design or specification with ratings for each section, certificates and passports for the materials, concealed-work certificates, the work log with thickness readings and the acceptance certificate. We hand over this set together with the work.

How often does duct fire protection need to be renewed?

It depends on the material and the operating conditions. Under ShNK 2.01.02-04 (clause 6.12), the interval for replacing or restoring a fire-protective coating is stated in its documentation, and that is what we follow. Damage caused by repairs and the installation of other services is restored on site.

Order fire protection for smoke extraction ducts

Send us the ventilation drawings or specification and we will select a system for the required ratings and price the work. Call or message us on WhatsApp and Telegram: +998 90 918 81 88. We travel to sites across Uzbekistan. Other services are in the fire protection treatment section, including fire protection of cables and cable lines. Our address and all contact details are on the contacts page.