Talimarjan TPP

Talimarjan thermal power plant. Construction of two combined-cycle units with a total capacity of 1,065 MW.

Scope of work on the steelwork: surface preparation, degreasing and dust removal, repair of the primer coating, application of the fire-protective compound and the topcoat enamel.

On the pipe racks the work comprised surface preparation, primer repair and application of a protective anti-corrosion enamel.

The steelwork of the main building is protected by a fire-protective compound with a topcoat enamel; the pipe racks are protected by an anti-corrosion enamel over the repaired primer.

Telegram